ANALYSIS OF DEEP DRAWING TITANIUM AND ITS ALLOYS USING FINITE ELEMENT SIMULATIONS | Jun-04 |
REDUCING THE DESIGN LEAD TIME BY INTERFACING VISUAL BASIC WITH SOLID EDGE | Jun-04 |
A SOLUTION TO THE FACILITY LAYOUT PROBLEM HAVING INNER STRUCTURE WALLS AND PASSAGES USING PARTICLE SWARM OPTIMIZATION | Jun-04 |
WELDING OF NINE PERCENT NICKEL STEEL FOR CRYOGENIC APPLICATIONS | Jun-04 |
MACHINE GROUPING IN ALTERNATE ROUTING ENVIRONMENT USING ANT COLONY TECHNIQUE TOWARDS LEAN PRODUCTION | Jun-04 |
CNC MILLING PART PROGRAM GENERATION FROM CAD MODEL WITH OPTIMUM NUMBER OF PASSES USING GENETIC ALGORITHM | Jun-04 |
DESIGN AND SIMULATION OF MEMS BASED PIEZORESISTIVE PRESSURE SENSOR | Jun-04 |
STUDY OF WRINKLING BEHAVIOUR USING TRACTRIX DIE AND FORMING LIMIT DIAGRAM ANALYSIS OF INTERSTITIAL FREE MILD STEEL | Jun-04 |
SHEET METAL FORMING SIMULATION AND SPRING BACK ANALYSIS | Dec-04 |
SIMULATION OF UPSET FORGING | Dec-04 |
FINITE ELEMENT ANALYSIS IN PRECISION ENGINEERING | Dec-04 |
PARAMETRIC MODELING OF GEAR SYSTEM | Dec-04 |
FINITE ELEMENT ANALYSIS IN TOOL ENGINEERING | Dec-04 |
SIMULTANEOUS OPTIMAL SELECTION OF DESIGN AND MACHINING TOLERANCES WITH DIFFERENT STACK-UP CONDITIONS USING SIMULATED ANNEALING ALGORITHM | Dec-04 |
MULTI SPEED GEARBOX DESIGN USING ANT COLONY OPTIMISATION TECHNIQUE | Dec-04 |
MODULAR FIXTURE LAYOUT OPTIMIZATION | Dec-04 |
FINITE ELEMENT ANALYSIS OF PRESSURE PARTS USING ANSYS | Dec-04 |
FORMING LIMIT DIAGRAM OFR INTERSTITIAL FREE STEEL | Dec-04 |
DESIGN AND DEVELOPMENT OF AN EFFICIENT LOGISTICS MANAGEMENT SYSTEM | June 2004 |
OPERATIONS MANAGEMENT SYSTEM FOR CONTINUOUS FLOW MANUFACTURING | June 2004 |
A NEURAL NET APPROCH TO REAL TIME FLOW SHOP SCHEDULING | June 2004 |
SIMULTANEOUS SCHEDULING OF JOBS AND AUTOMATED GUIDED VEHICLES USING ANT COLONY ALGORITHM | June 2004 |
MULTI PROJECT SCHEDULING USING HEURISTIC AND GENETIC ALGORITHM | June 2004 |
ASSEMBLY TASK SCHEDULING USING GENETIC ALGORITHM | June 2004 |
A MULTI OBJECTIVE ADAPTIVE GENETIC ALGORITHM FOR SIMULTANEOUS SCHEDULING OF JOBS AND AUTOMATED GUIDED VEHICLES | June 2004 |
FLOW SHOP SCHEDULING WITH LIMITED BUFFER SPACE | June 2004 |
DELINQUENCY STAGE PREDICTION:A COMPARATIVE VIEW OF MARKOV PROCESSES AND LOGISTIC REGRESSION MODELING TECHNIQUES | June 2004 |
AGV TASK SCHEDULING USING NON-TRADITIONAL OPTIMIZATION | June 2004 |
IMPLEMENTATION OF TABU SEARCH ALGORITHM TO MACHINE-GROUPING FOR CELLULAR MANUFACTURING SYSTEM | June 2004 |
IMPLEMENTATION OF GRASP IN FLOW SHOP SCHEDULING | June 2004 |
DESIGNING INVENTORY MODULE AND DEVISING IMPLEMENTATION METHODOLOGY FOR MAAGES | June 2004 |
MODIFIED GENETIC ALGORITHM FOR PRODUCTION DISTRIBUTION OPTIMIZATION OF MULTISTAGE LOGISTICS NETWORK | June 2004 |
MODERN MAINTENANCE TECHNIQUES AND APPLICATION OF SAP | June 2004 |
SUPPLY CHAIN OPTIMIZATION USING PARTICLES SWARM OPTIMIZATION(PSO) | June 2004 |
NON-LINEAR OPTIMIZATION OF PRODUCT MIX | June 2004 |
SCATTER SEARCH TECHNIQUE FOR JOB SHOP SCHEDULING. | Dec-2004 |
GENETIC ALGORITHM BASED MULTI OBJECTIVE TOLERANCE ALLOCATION PROBLEM | Dec-2004 |
PARTICLE SWARM OPTIMIZATION ALGORITHM FOR MULTI OBJECTICVE FLOW SHOP SCHEDULING WITH REGULAR AND NON REGULAR MEASURES | Dec-2004 |
LAYOUT OPTIMIZATION USING TABU SEARCH HEURISTIC | Dec-2004 |
MULTI ECHELON DISTRIBUTION INVENTORY SUPPLY CHAIN MODEL USING PARTICLE SWARM OPTIMIZATION | Dec-2004 |
MODELING AND SIMULATION OF PROJECTS WITH PETRI NETS | Dec-2004 |
MIXED MODEL ASSEMBLY LINE BALANCING USING ANT COLONY OPTIMIZATION | Dec-2004 |
PARALLE LINE JOB SHOP SCHEDULING USING PARTICLE SWARM OPTIMIZATIOPN | Dec-2004 |
AS/RS SCHEDULING IN FMS USING ADAPTIVE GENERIC ALGORITHM | Dec-2004 |
SOLUTION TO PERMUTATION FLOW SHOP SCHEDULING PROBLEM USING BICRITERIA GRASP APPROACH | Dec-2004 |
INVENTORY CONTROL (RAW MATERIALS & CONSUMABLES) | Dec-2004 |
OPTIMIZATION OF DIE SET-UP USING SINGLE MINUTES EXCHANGE OF DIES | Dec-2004 |
ARTIFICIAL IMMUNE SYSTEM APPROACH TO SOLVE JOB SHOP SCHEDULING PROBLEMS | Dec-2004 |
ESTABLISHMENT OF WELD QUALITY IN RESISTANCE SPOT WELDING | Dec-2004 |
ANALYSIS AND APPLICATION OFCREAFT ALGORITHM TO THE LAYOUT OF TEXTILE CARDING MACHINE MANUFACTOR | Dec-2004 |