| DESIGN AND DEVELOPMENT OF AN EFFICIENT LOGISTICS MANAGEMENT SYSTEM | June 2004 |
| OPERATIONS MANAGEMENT SYSTEM FOR CONTINUOUS FLOW MANUFACTURING | June 2004 |
| A NEURAL NET APPROCH TO REAL TIME FLOW SHOP SCHEDULING | June 2004 |
| SIMULTANEOUS SCHEDULING OF JOBS AND AUTOMATED GUIDED VEHICLES USING ANT COLONY ALGORITHM | June 2004 |
| MULTI PROJECT SCHEDULING USING HEURISTIC AND GENETIC ALGORITHM | June 2004 |
| ASSEMBLY TASK SCHEDULING USING GENETIC ALGORITHM | June 2004 |
| A MULTI OBJECTIVE ADAPTIVE GENETIC ALGORITHM FOR SIMULTANEOUS SCHEDULING OF JOBS AND AUTOMATED GUIDED VEHICLES | June 2004 |
| FLOW SHOP SCHEDULING WITH LIMITED BUFFER SPACE | June 2004 |
| DELINQUENCY STAGE PREDICTION:A COMPARATIVE VIEW OF MARKOV PROCESSES AND LOGISTIC REGRESSION MODELING TECHNIQUES | June 2004 |
| AGV TASK SCHEDULING USING NON-TRADITIONAL OPTIMIZATION | June 2004 |
| IMPLEMENTATION OF TABU SEARCH ALGORITHM TO MACHINE-GROUPING FOR CELLULAR MANUFACTURING SYSTEM | June 2004 |
| IMPLEMENTATION OF GRASP IN FLOW SHOP SCHEDULING | June 2004 |
| DESIGNING INVENTORY MODULE AND DEVISING IMPLEMENTATION METHODOLOGY FOR MAAGES | June 2004 |
| MODIFIED GENETIC ALGORITHM FOR PRODUCTION DISTRIBUTION OPTIMIZATION OF MULTISTAGE LOGISTICS NETWORK | June 2004 |
| MODERN MAINTENANCE TECHNIQUES AND APPLICATION OF SAP | June 2004 |
| SUPPLY CHAIN OPTIMIZATION USING PARTICLES SWARM OPTIMIZATION(PSO) | June 2004 |
| NON-LINEAR OPTIMIZATION OF PRODUCT MIX | June 2004 |