Title of Project |
Funding Agency |
Duration |
Status |
Role |
|
From |
To |
Ongoing/ Completed |
|||
Development of New Electrode Using 92% Rutile Grade Flux With Improved Operability and Industrial Applicability | IREL (India) Limited | 2023 | 2024 | Ongoing | PI |
Development of nano composite coating on MMAW electrodes for reduction of hazardous constituents in welding fume |
DST-AMT |
2018 |
2020 |
Completed |
PI |
Development and Thermal Analysis of Non-Azide Gas Generating Compositions for |
DST-SERB |
2017 |
2019 |
Completed |
PI |
Measurement of Particulate Matters (PM 2.5, PM 1, PM 0.5, PM 0.25) of the SMAW |
IGCAR, Kalpakkam |
2017 |
2018 |
Completed |
PI |
Specific Electrical Conductivity of Kerosene Based Fuels |
ISRO- LPSC, Trivandrum |
2016 |
2017 |
Completed |
PI |
Experimental Investigation of Impact Initiation of Sound Light emitting Pyrotechnic Composition |
ARMREB, DRDO |
2016 |
2019 |
Completed |
PI |
Analysis of Welding fumes for Consumables used in fabrication of Nuclear components |
IGCAR |
2014 |
2017 |
Completed |
PI |
Design of Experimental matrix for Heat Transfer Studies at Super critical test Facility |
BHEL, Trichy |
2012 |
2013 |
Completed |
PI |
Modeling of Environmental Emission and Design and Development of Fuzzy controlled Fume Extraction System for Electric Discharge Machining Process |
Ministry of Environment and Forest, Government of India |
2010 |
2013 |
Completed |
PI |